Hallo together
We are using SAP BO 4.1 with SP 4 and DS 4.2 with the actuall patch level.
We have implemented some DS_Jobs to load data from a source to a DWH and we are using the DS controlling to schedule a Job to load these data.
Is it posible to schedule the DS - Job with the windows taskmanager and if yes how does it work.
friendly Regards
Ralph Kornack