Hi,
I am trying to achieve the delta loading by using Source table time stamp and target table max(insert date) with the help of job control table.
I have created script initialization and kept the below code in it. Source is Oracle and target is HANA.
When I execute the job, it's giving the below error.
Not sure if there is some issue with the code.
Regards,
Venkat N