We have successfully upgraded our test system from BODS 3.2 to 4.2 and in the next two weeks, we'll be upgrading our production system.
The difference between the test and prod servers is that our production server is high availability server.
Are there any additional steps for the upgrade in the high availability server? Or it will be the same with how we do it in the test system?
Is there anything we have to do in the cluster level?
Thanks!