Hi, need help..
The below steps were followed to schedule a FIM job:
1.save the FIM job as a scheduling file.
2.this vbs file is placed in the BODS job servers(group server is used)
3. Schedules created in DS Management Console using data services scheduler to run the BODSjob which triggers the vbs.
4. Once the vbs is successfully triggered, the FIM job runs.
Issue 1: scheduled job runs multiple times at a given time.
Issue 2: all of a sudden the vbs placed in DS job server does not start the FIM job.