I have a production system of Data Services 4.2 (14.2.1). It has 20gb of ram and 6gb of pagefile space. We have been systematically putting jobs in prod and running those jobs over the course of the last week at their scheduled times. But over the weekend the last two jobs were added and they seem to have caused a situation where the server ran out memory. The SIA stops and really does not seem to be resolved without a server restart. So my question is. The last 2 jobs I added used a different job server than the first six. Should I change this so that all the jobs use a single job server. The jobs do exist in multiple repo's
Regards,